|
Stern Locker center section bond 01
|
Front mounting structure was bonded earlier to center locker top and now that fillet is cleaned up. This unit is about to be bonded to the side plates that become its sides. It will be more difficult to dremel that fillet with the sides in the way, so it is done full length now. :)
|
|