Boat Builder Central Photo Gallery

Our builder's online photo album


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favorites Search
Home > User galleries > ks8 > CB Case - slot - shoe - skeg
Bilge Box 13
First picture of two of how the top plates will fit into place.  Two 3/16 inch dowels will be used to align and hold them in proper position when glued.  (edit: I used drywall screws and just filled the holes later). Three layers of masking will be applied to areas where the final primer and paint will build up the thickness slightly.  The theory is that the box assembly will then fit neatly into place with very little gap, and the mounting holes not thrown off by the final extra thickness.

Bilge Box 13

First picture of two of how the top plates will fit into place. Two 3/16 inch dowels will be used to align and hold them in proper position when glued. (edit: I used drywall screws and just filled the holes later). Three layers of masking will be applied to areas where the final primer and paint will build up the thickness slightly. The theory is that the box assembly will then fit neatly into place with very little gap, and the mounting holes not thrown off by the final extra thickness.

Bilge_Box_11_DSC09310.jpg Bilge_Box_12_DSC09311.jpg Bilge_Box_13_DSC09313.jpg Bilge_Box_14_DSC09314.jpg Bilge_Box_15_DSC09315.jpg
File information
Filename:Bilge_Box_13_DSC09313.jpg
Album name:ks8 / CB Case - slot - shoe - skeg
Boat Plan name:CV16
Filesize:95 KiB
Date added:Nov 15, 2013
Dimensions:800 x 600 pixels
Displayed:29 times
URL:https://www.community.boatbuildercentral.com/gallery/displayimage.php?pid=50843
Favorites:Add to Favorites