Boat Builder Central Photo Gallery

Our builder's online photo album


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favorites Search
Home > User galleries > ks8 > 2003 Caravelle Cuddy Interior
Two Halves joined at limber hole
The limber hole area was preshaped before either half was glued into the boat.  I will post more pictures of the construction and installation of this frame/beam if I am asked.

Two Halves joined at limber hole

The limber hole area was preshaped before either half was glued into the boat. I will post more pictures of the construction and installation of this frame/beam if I am asked.

DSC01720 thatll do.jpg DSC01749 beam below.jpg DSC01758 Beam Fr Bottom.jpg DSC01771 grind hatch #D7C37.jpg DSC01780 hr in clamped.jpg
File information
Filename:DSC01758 Beam Fr Bottom.jpg
Album name:ks8 / 2003 Caravelle Cuddy Interior
Rating (2 votes):00000
Boat Plan name:Caravelle CV16
Filesize:75 KiB
Date added:Jan 22, 2004
Dimensions:500 x 335 pixels
Displayed:491 times
URL:https://www.community.boatbuildercentral.com/gallery/displayimage.php?pid=241
Favorites:Add to Favorites