Boat Builder Central Photo Gallery

Our builder's online photo album


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favorites Search
Home > User galleries > ks8 > Mast Step Mods
Upper MS Lam test fit
The upper two laminates of the permanent Mast Step are test fit here on top of the lower limber drainage laminates.  The actual, removeable, mast step plate bolts on the top of all this, so various masts and positions can be tested with the rig.

Upper MS Lam test fit

The upper two laminates of the permanent Mast Step are test fit here on top of the lower limber drainage laminates. The actual, removeable, mast step plate bolts on the top of all this, so various masts and positions can be tested with the rig.

BB box floor ext dry.jpg DSC03628 upper ms fit.jpg DSC03629 ms limber side.jpg DSC03645 bronze in filler.jpg DSC03618 limber ms base.jpg
File information
Filename:DSC03628 upper ms fit.jpg
Album name:ks8 / Mast Step Mods
Rating (1 votes):00000
Boat Plan name:CV16 Caravelle
Filesize:42 KiB
Date added:Oct 31, 2005
Dimensions:600 x 450 pixels
Displayed:425 times
URL:https://www.community.boatbuildercentral.com/gallery/displayimage.php?pid=5975
Favorites:Add to Favorites