Boat Builder Central Photo Gallery

Our builder's online photo album


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favorites Search
Home > User galleries > ks8 > Mast Step Mods
Upper Mast Step plate ready to bond
The lower portion is finished with Epoxy with Teflon additive in the water drainage slots, wet sanded with 600.  Sm-o-o-o-th and slick.  Water runs right out.  The final upper plate is ready to bond in.  Note the small dowel holes which have matching dowels in the underside... self aligning for the install.  Filler glue is applied sparingly to the bottom only, and 1/4 inch clear of the drainage areas so filler putty does not ooze into the drainage areas.  Inspection afterwards showed success.

Upper Mast Step plate ready to bond

The lower portion is finished with Epoxy with Teflon additive in the water drainage slots, wet sanded with 600. Sm-o-o-o-th and slick. Water runs right out. The final upper plate is ready to bond in. Note the small dowel holes which have matching dowels in the underside... self aligning for the install. Filler glue is applied sparingly to the bottom only, and 1/4 inch clear of the drainage areas so filler putty does not ooze into the drainage areas. Inspection afterwards showed success.

DSC03618 limber ms base.jpg DSC03667 upper ms ready.jpg DSC04577 Upper MStep plate ready.jpg DSC04582 Mast Step install final.jpg DSC04583 Universal Mast Step Rough.jpg
File information
Filename:DSC04577 Upper MStep plate ready.jpg
Album name:ks8 / Mast Step Mods
Rating (2 votes):00000
Boat Plan name:CV16 Caravelle
Filesize:138 KiB
Date added:Jul 07, 2006
Dimensions:800 x 591 pixels
Displayed:361 times
URL:https://www.community.boatbuildercentral.com/gallery/displayimage.php?pid=8698
Favorites:Add to Favorites