Boat Builder Central Photo Gallery

Our builder's online photo album


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favorites Search
Home > User galleries > ks8 > Caravelle seats and under them
Compared the fitting to the turned fitting
I had to take down the fittings a bit past the ridges, and still boil the hose, to get it to fit and yet be removeable without cutting it off.  I would not want to cut off tube through that small access hatch, by feel, and then have to try and jam on a replacement hose.  The result is good.  The process necessary was a pain.

Compared the fitting to the turned fitting

I had to take down the fittings a bit past the ridges, and still boil the hose, to get it to fit and yet be removeable without cutting it off. I would not want to cut off tube through that small access hatch, by feel, and then have to try and jam on a replacement hose. The result is good. The process necessary was a pain.

DSC04415 almost ready for tops.jpg DSC04404  large radius corners.jpg DSC04641 turned fittings.jpg DSC04677 stbd seat batten.jpg DSC04676 essential in heat.jpg
File information
Filename:DSC04641 turned fittings.jpg
Album name:ks8 / Caravelle seats and under them
Boat Plan name:CV16 Caravelle
Filesize:135 KiB
Date added:Aug 01, 2006
Dimensions:800 x 600 pixels
Displayed:304 times
URL:https://www.community.boatbuildercentral.com/gallery/displayimage.php?pid=8947
Favorites:Add to Favorites